Jump to content

- - - - -


  • Please log in to reply
2 replies to this topic

#1 northbassman



  • TU Member
  • PipPip
  • 55 posts

Posted 10 December 2003 - 10:41 AM

Should I use the 5 minute Devcon for the diving lips and eye screws and then the Devcon 30 minute for the finish or just use one for the both of them?

#2 Nathan


    Advanced Member

  • Site Moderator
  • PipPipPip
  • 1,966 posts
  • Location:

Posted 10 December 2003 - 10:59 AM

Devcon 5 minute is fine for setting the diving bills..but I use the 2ton for everything else.It gives you a bit more working time..Nathan

#3 Littlebear



  • TU Member
  • PipPip
  • 55 posts

Posted 10 December 2003 - 11:52 AM

the 2 ton sets much slower for sure.. the only problem I have with it is when you cover large baits you must keep them rotating till the stuff starts to set.. I like the 5 minute.. I have done it so much I don't find a problem with get it on the bait before it starts to set..I do use the 2 ton
on lips..screw in eyes and other hardware.. I'm not sure that its that much stronger but I use it anyway..I figure lips take a lot of banging and screw eyes need to be as strong as I can make them

just my 2 cents